Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 4000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Use
This device is suitable for automatic feeding and cutting processing of direct pipe pipes into a ruler length, and cutting off the two -headed chamfer plane.
2. Features
1). Use CNC control system and servo control system to achieve complete automation of the system, improve the stability of work, easy operation, simple maintenance, and compact joints, which greatly improves production efficiency.
2). Equipment control system has an automatic counting function and can accurately count the processing quantity.
3). Process flowchart
NO. | Item | Qty | Brand |
1 | CNC System | 1 unit | JISUN |
2 | Cylinder | 1 batch | AIRTAC |
3 | Switching Power | 1 pc | MW |
4 | Servo Motor | 3 sets | INOVANCE/HCFA |
1 Processing material aluminum pipe
2 The processing process is sawn and cut, and the two heads are chag up
3 The processing pipe diameter φ6.35-9.52mm
4 Processing Wall thickness 0.5 -1.2mm
5 Processing length 20-30mm (according to the requirements of the drawings)
6 Production efficiency 550-800pcs/h
7 -station model 2 mold
8 The spindle concentricity ≤ 0.05mm
9 Operation mode Automatic/manual/click
10 Swing -up method direct management
11 Driving Method Payment/Servo
12 Air pressure 0.5 ~ 0.8MPa
13 Saw tool motor three -phase 380/2.2kW
14 Double -headed rotating motor 2.2kW
15 Power Supply Three -phase 380V/50Hz
16 Hosting Dimensions (Long X wide X high) MM 1900X1000X1700
17 The shape size of the feed rack (long x wide X height) mm 2000x700x1500
- Specify the pressure/oil pressure pressure every day to ensure reliable use.
- Regularly lubricate each motion component and keep the equipment tidy.
- Regularly clean the equipment inside and outside the equipment. Each sliding surface, screw, oil hole and other oil are not polluting, and all parts do not leak oil or air. The cutting and dirt around the equipment should be cleaned to avoid affecting operation and product quality.
- The work hours of the equipment are calculated every day at 8-10 hours. If the production time is required for a long time, it is necessary to strengthen the operation and maintenance of the operating status of accessible parts, motors and other accessories to ensure the work stability of the equipment.
Q: Are you a manufacturer or trading company?
A: We are a manufacturer. We are focusing on metal pipe/tube processing machines production.
Q: How to choose the pipe/tube bending machines?
A: You need to tell us the following tube parameters:
- Tube material
- Tube diameter
- Tube thickness
- Tube length
- Tube bending angle
- Tube drawings if possible
Q: What certificate do you have?
A: We have both ISO and CE certificate.
Q: How about your service?
A: Before Sales Serive:
(a)We will provide you with our professional tech.proposal and machine videos for your reference.
(b)We will try our best to answer all the questions and help you solve all the problems.
(c)Welcome to visit our factory!