• Automatic Double-Head Deburring Machine (long style)

Automatic Double-Head Deburring Machine (long style)

Certification: ISO, CE, ISO 9001:2000, Ce
Condition: New, New
Voltage: 220V
Application: Metal Tube
Waterproof Rating: Ipx-6
Warranty: 1-Year
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2020

Suppliers with verified business licenses

Guangdong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 8 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
Patents Awarded
The supplier had awarded 6 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (26)

Basic Info.

Model NO.
JM-DF-S302A
Suitable for
Copper
Type
Pipe and Tube Deburring Machine
Transport Package
Wooden Box
Specification
3000mmx1000mmx1200mm
Trademark
JISUN
Origin
China
HS Code
8479819000
Production Capacity
100 Sets One Year

Product Description

One. Use
This equipment is used to remove residual burrs on both ends of the copper pipe after cutting.
Two. Features
  1. The equipment uses a PLC controller, which fully considers safety and other factors. It is easy to debug and simple to operate. The material is automatically processed and discharged after the vibrating plate is loaded. The rhythm is fast and the efficiency is high.
  2. The equipment control system should have an automatic counting function to accurately count the number of processes.
Three. Equipment parameters
NO. Parameter items Content
1 Pipe diameter range φ14-φ32mm
2 Pipe thickness range 0.5-2.0mm
3 Pipe length range 100-1200mm
4 Work efficiency 2000-3000PCS/H
5 Drive method PLC system / speed control motor / air pressure
6 Feeding method Manual loading
7 Operation method Auto / Manual / Jog
8 air pressure 0.5~0.8MPa
9 Power mode Three phase380V/50HZ
10 Overall dimensions (length X width X height) MM 3000x1000x1200
Four. Equipment structure and system configuration
  1. Overview: The equipment consists of a frame, a double-headed power shaft, a feeding system, an electronic control system, a vibration plate, and the like.
  2. Frame: The fuselage is welded by profiles, and processed after vibration aging to ensure rigidity and accuracy of the mounting plane. It is equipped with four height-adjustable foot cups and safety protection doors;The parts of each part of the equipment are subjected to necessary surface treatments such as electroplating, blackening, quenching, carburizing, electrostatic spraying, etc. according to the actual working conditions and working environment to meet the components with sufficient strength and surface functions.
  3. Double-headed power shaft: The maximum speed is 1400 rpm, and it is driven by a synchronous belt.
  4. Feeding system: The speed control motor is input by the timing belt, and the cylinder feeds in two directions. The speed control motor is output by the timing belt, and the beat is adjustable.
  5. Coloring:The main body of the device is blue (Jisun color number JS-SK-003), and warning signs are placed on the parts involved in personal safety.
  6. Electric control cabinet:Using the CNC system, the air switch adopts domestic high-quality air switch, Schneider button, and other main electrical components such as select switches and intermediate relays are all OMRON products. The control circuit is provided with overload protection function.
  7. The installation of the electrical components of the equipment complies with the relevant national regulations and has a reliable grounding device. The terminals, contactors and small air switches in the electrical box are installed in the VDE standard V-groove. Each electrical component is clearly marked. The electric control cabinet uses all-plastic combing cabinets with wire trunking for clear wire numbers; the control panel is clean and the subtitles on the signs are clear and easy to see.
Five. List of main parts and maintenance
  1. List of main accessories
NO. Name Quantity Brand
1 PLC 1 set MITSUBISHI
2 Motor 2 piece FENGSHENG
3 Speed motor 2 set PANASONIC
4 Pneumatic components 1 batch AIRTAC
5 Leakage switch 1 piece CHINT
6 Transparent shell fuse 1 piece CHINT
7 Switching power 1 piece MW
8 Intermediate relay 1 set OMRON
9 Proximity switch 1 batch YM
 
  1. Check the air / oil pressure and the condition of each fastener daily to ensure reliable use.
  2. Regularly lubricate moving parts and keep the equipment tidy.
  3. Clean the dust of the equipment regularly to avoid affecting the operation and product quality.
  4. The normal working time of the equipment is calculated from 8-10 hours per day. If the working time is longer due to production, the inspection and update of wearing parts, motors and other accessories should be strengthened to ensure the stability of the equipment.
Six. Delivery period
45 days after the prepayment.
Seven. Payment method
L/C or T/T
Eight. Services and other
  1. Product quality warranty for one year, (except for artificial or abnormal use) wearing parts are not included in the warranty scope. For details, please refer to the "wearing parts list" in the instruction manual.
  2. You are very welcome to visit our factory to see our machine how to work before you place an order with us.
  3. This product is delivered randomly: a manual and a set of molds (if other specifications are required, the cost will be quoted separately).
  4. If customer have any question about operation when using our machine,we will reply you by email/telephone/other online chat tool within 24 hours.
  5. The buyer needs to provide power voltage, compressed air gas source and grounding devices in accordance with electrical specifications on the site of the manufacturer's workshop; the buyer must configure the cables and air pipes connected to the equipment.
  6. The circulating cooling water, hydraulic oil (recommended to use 46 brand hydraulic oil), lubricating oil and cooling oil required by the equipment are purchased by the purchaser.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
31
Year of Establishment
2010-09-16